KKIA – T1 T2 Refurbishment

  /    /    /    /  KKIA – T1 T2 Refurbishment

Project Description

Technical Details

  • Full interior refurbishment works of existing Terminals 1 and 2 FOH areas, including a new metro hall to optimize the passenger’s experience. Works to be completed before the start of the G20 summit without interruption of operation.
  • Conversion of Terminals 1 and 2 into domestic Terminals after the G20 summit.
  • Refurbished Area: 60,000 m² 3 floors and Mezzanine level
  • Existing Steel building
  • New metro hall